Frequently Asked Questions
Q1 How to make the payment?
T/T and letter of credit are acceptable, and we will be even more grateful to T/T. 30% deposit before production and 70% balance before T/T loading.
Q2 What is the delivery time?
This depends on the order quantity. Generally speaking, the delivery time will be within 15 to 30 days.
Q3 How to ship?
Ocean container loading.
Q4 How to install it?
We will provide you with installation instructions and videos, and if necessary, we will send technical personnel to assist you. However, visa fees, airfare, accommodation, and wages will be provided by the buyer.
Q5 How do you ensure the quality of the product?
Strict product quality control enables quality to achieve the future. This is the purpose of our factory. Every product in our factory has strict testing procedures and must achieve 100% quality before delivery.
Q6 Is it difficult to assemble the room?
Not at all. As long as you can use electric tools, you can build a house independently according to the construction drawings.